2k apartment vul. Sim'i' Kul'zhenkiv 22
- Add to favorites
-
Share link
"Polaris House" residential complex, 2-bedroom flat. Ready for renovation and locked up. The floor screed has been laid, the electrical wiring is in place, and connections for heating and water supply are provided in the kitchen and bathroom, as well as a space for installing a boiler. The flat is fitted with electricity, water and heating meters. The ceiling is unfinished, allowing you to implement your own design ideas. A separate, two-section, 16-storey building with its own electric boiler rooms in each section to provide heating. The lifts are operational. All utilities are connected to the building. The water supply is connected to the municipal network; work is currently underway to connect the sewerage system. The building is scheduled to be commissioned in the fourth quarter of 2026. The building has its own separate, enclosed grounds with restricted access and entry. A children’s playground and parking spaces have been provided for residents. There is a planned exit onto Pancha Street.